SP 205
The conversion of a recently built industrial warehouse in the province of Pavia into a modern logistics hub required a high-precision controlled demolition project to adapt the existing structure to its new operational requirements.
The works included the creation of new loading bays through openings in precast concrete wall panels using diamond wall saws, as well as core drilling and wall and floor openings to accommodate the installation of new building services.
The project involved approximately 200 m³ of controlled demolition, carried out using diamond cutting technologies that ensured maximum precision while minimizing vibrations and avoiding unnecessary impact on the existing structure. The main challenge was not only the scale of the works, but also the need to complete all activities within a particularly demanding schedule. Every operation was successfully completed over a three-month period, maintaining the highest quality standards and ensuring the precise execution of every opening and penetration.
The result was a project delivered on time with millimetre-level accuracy, providing the ideal conditions for the subsequent development of the new logistics hub.






.jpeg)
.jpeg)



.jpeg)





























.jpg)






















.jpeg)



%25201.png)