CASOREZZO
Demolition engineering intervention at the Casorezzo aqueduct: we removed a pillar from the tower, verifying that it remained in balance, before proceeding with the demolition.
1
Day
300
m3
Demolition engineering intervention at the Casorezzo aqueduct: we removed a pillar from the tower, verifying that it remained in balance, before proceeding with the demolition.