CASOREZZO
Demolition engineering intervention at the Casorezzo aqueduct: we removed a pillar from the tower, verifying that it remained in balance, before proceeding with the demolition.




1
Day
300
m3
Demolition engineering intervention at the Casorezzo aqueduct: we removed a pillar from the tower, verifying that it remained in balance, before proceeding with the demolition.




.jpeg)





























.jpg)






















.jpeg)



%25201.png)






