WATT 22

Demolitions, strip-outs, and remediation for the conversion of industrial buildings into residential buildings in Via Watt in Milan

WATT 22

For the conversion of a building from industrial to residential use, remediation of friable asbestos-containing materials (ACM) covering the steel ties and asbestos-containing membranes was carried out, as well as the removal of category 2 man-made vitreous fibers (MMVF) present in the walls.

Subsequently, a preliminary strip-out before demolition was performed, removing all non-structural materials and internal systems. This step facilitated the complete demolition of the buildings, which was executed in a controlled manner and in compliance with safety regulations. Finally, excavation under remediation conditions was conducted to prepare the site for new residential construction, ensuring the removal of any remaining contaminants in the soil.

1

Building

3000

Sqm Strip out

10000

M3 demolition