ORTA SAN GIULIO
On the shores of Lake Orta, we carried out the controlled demolition of the top floor of a four-story building while keeping the slab intact and removing iron and reinforced concrete structures, including a rooftop swimming pool. The operation was accomplished through precise demolitions and robotic demolitions.
1
Buildings
40000
m3